Project overview: Suntory Oceania – Field of Dreams 

🔌 LV Cable Installation: Installed 25,000m of low-voltage cabling, ranging from 16mm² to 500mm², across both cable tray and underground systems. 

 

☀️ Solar Power Integration: 5,000m of 400mm² XLPE cable installed to combiner boxes through a complex roof system — with cable runs reaching up to 400m per phase. 

 

🚛 Specialised Equipment: Utilised mechanical winches and truck setups to manage heavy cable drums and ensure safe, efficient cable hauling throughout the site. 